Consortium consisting of Termoinženjering and Deneza M has contracted and successfully executed designing, permissions obtaining and construction of new Mixing plant facility within Tigar Tyres industrial complex in Pirot.
This particular plant is one the most challenging projects regarding designing and construction. Mixing Plant consists of three sections:
- Production section total height 44m
- Outer area of silo total depth -8m
- Annex wing with office and accompanying space.
Six silos of 288m3 positioned on steel construction, connected to technology equipment via pneumatic transport system. Two production lines for rubber compound have three mixers of 320, 550 and 1000 lit. Mechanical transport is done by transport system.